Build up and renovation project ABN-AMRO bank Amsterdam

Holland Composites > Architecture > Build up and renovation project ABN-AMRO bank Amsterdam

Projectdetailsx

Project detailsx

Client: BAM | ABN AMRO
Architect: Broekbakema architecten en BTC Architecten
Project developer: EDGE Technologies
Location:
 Foppingadreef Amsterdam, The Netherlands
Year: 2027
Surface: 1,200 m2
Material: Duplicor® biobased fire resistant composite
Specifics: On Foppingadreef in Amsterdam Zuidoost, work has started on the redevelopment of ABN AMRO’s offices. Once completed, this office will be the green home of almost 11,000 employees. It will also have a social function. The building will be energy-efficient and converted in a circular way as much as possible.

When the redevelopment is completed in 2027, the building will be more sustainable than required by the Paris climate agreement – also three years ahead of ABN AMRO’s own climate target.

The redevelopment plans for the more than 100,000 m2 building are in line with ABN AMRO’s sustainable vision and goals and were designed in collaboration with property developer Edge and the building’s original architect: Broekbakema. Realisation of this project is in the hands of BAM Bouw en Techniek.

ABN AMRO has set the ambition for all their offices to comply with the Paris Climate Agreement by 2030. In line with this ambition, the aim of this redevelopment is precisely to renew, expand and ‘Paris Proof’ the existing building on Foppingadreef, rather than opting for new construction. Thus, 70,000 m2 of the building will be reused and many of the materials released during demolition will be put to new uses. And instead of concrete, wood will be used for the main load-bearing structure of around 30,000 m2 of new office floors.

There will be 10,500 m2 of solar panels on the roof and facade of the complex, significantly reducing energy consumption compared to the existing building. Circular principles will be integrated into every phase of the redevelopment. As a result of these choices, among others, this building will be awarded at least a BREAAM Excellent sustainability certification.

Using our Duplicor® integral façade elements, the existing office complex is extended with a 2-storey topping.

Duplicor® was chosen for its sustainable nature as a bio-based material, low CO2 footprint, high RC value (>9) and light weight combined with high structural strength.

Duplicor® façade elements are combined with the original clay baked and glazed tile finish to preserve the characteristic architectural value of the original building.

An additional and unique advantage of Duplicor® is its high fire safety: fire standard B S1 D0 according to NEN-EN 13501 SBI. This means that Duplicor® has no flame spread, makes a very limited contribution in case of fire and is very difficult to burn.

We are proud to be working with Edge Technologies, Broekbakema architects, BTC architects and BAM to do our bit for the renewed green home of ABN AMRO employees.

Freedom of design and appearance as desired, Duplicor bio-based composite: for the sustainably built facades of the future.

Want to know what is possible? Make an appointment!

Want to know what is possible? Make an appointment!

Meet the spectacular DNA foiling boats now!

To the website

Download our FREE inspiration book

Be inspired by the unlimited possibilities of composites. Download our inspiration book and view our worldwide projects.

  • This field is for validation purposes and should be left unchanged.
Close Popup

Wij gebruiken cookies om u de beste online ervaring te bieden. Door akkoord te gaan, accepteert u het gebruik van cookies in overeenstemming met ons cookiebeleid.

Close Popup
Privacy Settings saved!
Privacy-instellingen

Wanneer u een website bezoekt, kan deze informatie in uw browser opslaan of ophalen, meestal in de vorm van cookies. Beheer hier uw persoonlijke cookiediensten.

Deze cookies zijn nodig om de website te laten functioneren en kunnen niet worden uitgeschakeld in onze systemen.

Technische cookies
Om deze website te gebruiken, gebruiken wij de volgende technisch vereiste cookies
  • wordpress_test_cookie
  • wordpress_logged_in_
  • wordpress_sec

CloudFlare
Omwille van de prestaties gebruiken we Cloudflare als een CDN-netwerk. Hiermee wordt een cookie "__cfduid" opgeslagen om beveiligingsinstellingen per client toe te passen. Deze cookie is strikt noodzakelijk voor de beveiligingsfuncties van Cloudflare en kan niet worden uitgeschakeld.
  • __cfduid

Google Tag Manager
We gebruiken Google Tag Manager om ons verkeer te controleren en ons te helpen bij het testen van nieuwe functies.

Decline all Services
Save
Accept all Services